Through Summer 2010: Major reconstruction is in progress on I-75 at various locations between Exit 37 (Adel/Old Quitman Road) and the Crisp/Dooly County Line. No lane closures 7 am - 7 pm.
- COOK/TIFT: I-75 / Exit 41 on-ramp temporarily closed to traffic. This ramp closure is to replace the railroad overpass bridge on I-75 NB. Northbound traffic shifted between MPs 39 and 59.
- TURNER: I-75 is now six lanes in both directions between MPs 78-84.
- CRISP: Lane closures between Exit 99 (SR 300) and Dooly County Line. Southbound traffic shifted to new lanes between Exits 99 and the Crisp/Dooly County Line. Northbound traffic shifted to southbound side between MPs 98 and 107. Shoulders temporarily closed with barrier walls. Emergency pull-offs available at various locations southbound between MP 98 and the Crisp\Dooly County line.
Motorists in these areas are strongly advised to slow down, use caution, and allow extra travel time.
- For more information about this project, click here.
- For a real-time list of lane closures on I-75, click here.
- For real-time traffic conditions in the work zone, click here.